Gerberhaus at Griesplatz in Sarnthein: 13 apartments and 2 shops, ClimateHouse A Nature, in the village centre. Construction September 2025, handover March 2027. Currently being rebuilt. Direct contact with Moser Bau.
The Gerberhaus stands on Griesplatz in the centre of Sarnthein. The building is being converted into 13 apartments and two retail units, built to KlimaHaus A Nature. Apartments start at around 50 m² with two rooms.
All apartments are on the open market. The list shows a three-room apartment of around 62 m² on the first floor (as of October 2026). The central location means short walks to shops, school and the bus stop.
Works have been under way since September 2025, handover is planned for March 2027. The contact is Moser Bau.
Units
The project comprises 13 apartments. The one currently available is listed. Availability and details directly from the developer.
| Unit | rooms | Area | Floor | Price | Status |
|---|---|---|---|---|---|
| A.105 | 3 | 61.9 m² | 1. OG | € on request | Available |